Co-Own an EV Charger | My EV Charger
New · Co-ownership model

Own a share of a
DC fast charger. Not the whole bill.

A DC charging station needs a large upfront investment. Pool it with a small group of co-owners, each holding a fixed share of one charger and its earnings.

Early-interest stage · No payment required to sign up
A 60 kW DC fast charger shared by four co-owners, each holding 25%
The problem

Fast charging is a good business. Starting one is expensive.

India needs far more public DC chargers than it has today. But a single station means equipment, civil work, power connection and site costs, usually beyond what one individual can fund alone.

Co-ownership changes that. A 120–240 kW charger, for example, can be split into five equal parts, so five people each fund and own 20%.

A 120–240 kW charging station shared by five co-owners, each holding 20%
₹ Lakhs

Upfront cost for one DC charger once hardware, installation, transformer and grid connection are included.

1 owner

Most setups today need one person or business to carry the full investment and the full risk.

Shared

Co-ownership splits both: a smaller cheque per person, with the asset and earnings divided in fixed shares.

How it works

Your journey to shared ownership

It starts with a simple form.

Four steps: fill the form, join the waiting list, get a verification call, join an EV charger project group

Fill the form

Tell us the charger size, number of shares and city you're interested in. Takes under a minute.

Join the waiting list

Your interest is recorded instantly. No payment or commitment needed.

Get a verification call

Our team calls to verify your details and answer your questions.

Join a project group

After verification, you're added to a charger project group with other co-owners in your area.

Share structure

Bigger charger, more co-owners

Each charger is divided into a fixed number of equal shares based on its power rating.

60 kW
4shares

25% per share. Entry-level DC, suited to highways, malls and fleet depots.

120 – 240 kW
5shares

20% per share. Higher throughput for busy corridors and commercial hubs.

Above 240 kW
10shares

10% per share. Large hubs, buses and trucks; the lowest entry per owner.

Estimate your share

Pick a charger size and adjust the total project cost to see what one share might cost.

Default costs are illustrative placeholders, not quotes. Actual costs depend on brand, site, civil work and power connection.

Indicative cost per share
₹ —
Charger—
Total shares—
Ownership per share—
Why co-own

The upside of a charging business, at a fraction of the entry cost

Lower entry cost

Pay for a share, not a full station. Larger chargers split into more shares, lowering the cheque further.

Share in charging revenue

Earn your proportion of net earnings from every session as EV adoption grows.

Shared risk

Downtime, maintenance and utilisation risk are spread across owners instead of falling on one person.

Verified chargers

Choose from brands listed on My EV Charger, India's multi-brand EV charger platform.

Site support

Help identifying viable locations using our site-finder data, so the charger goes where demand is.

Be part of the transition

Own real infrastructure that helps more Indians switch to electric.

Waiting list

Register your interest

We're gauging demand before launching co-ownership. Join the list and we'll contact you as groups form in your city.

  • No payment or commitment to sign up
  • Priority access when the first groups open
  • Full terms and costs shared before anything is final
Questions? Call or WhatsApp +91 78368 83675

You're on the waiting list

Thanks, there. We've saved your interest in co-owning a charger.

Our team will call to verify your details, then add you to a project group as one forms in your city.

Explore chargers on My EV Charger
FAQ

Common questions

Is this live? Can I invest now?

Not yet. We're measuring interest before launching the model. Signing up puts you on a waiting list; no money is collected and nothing is committed.

How are earnings shared?

Net earnings after operating costs (electricity, maintenance, site rent, operator fees) would be split in proportion to shares held. Exact terms will be shared before anyone commits.

Are returns guaranteed?

No. Charging income depends on location, utilisation, tariffs and power costs. We'll share realistic projections and assumptions, not promises.

Who operates the charger day to day?

The plan is for a professional operator to manage the station, app, payments and maintenance, so co-owners don't have to run it themselves.

What if I have land or a parking space?

Select "I own / lease a site" in the form. Site owners can be a valuable part of a co-owner group.

Can I buy more than one share?

Yes, you can indicate this in the form. Final limits per owner will be set when groups are formed.

India's EV Charging Infrastructure is a Decade-Long Opportunity

My EV Charger - The Intelligence Layer Every Deployment Needs

India has millions of EVs on the road and fewer than 25,000 public charging points. The gap is massive — and growing. My EV Charger connects serious buyers with verified manufacturers and CPOs to accelerate every deployment across India.

You have been successfully Subscribed! Ops! Something went wrong, please try again.

India’s first multi-brand EV charging discovery and intelligence platform. Backed by All India EV — Educate · Aware · Promote.

business@myevcharger.in

© 2026 Right Reserved with All India EV

Support